Our Jobs
Home
Our Jobs
Oil and Gas
Oil and Gas
BUOY 230T
Limassol port - Direct delivery of a buoy from a Jumbo heavy vessel, lashing/securing and transport from quay to storage yard and unload on stools with 'Roll out' method. After 1 year of storage, we load the buoy again with the 'Roll in' method and deliver it back to a vessel.
See gallery
Cable reel 115 tons
Transport from vessel to storage yard in DPWL and unload on stools with the method of 'Roll out'. Load with the method of 'Roll in' and transport from storage yard of DPWL to CPA Limassol terminal and unload with the use of crane.
See gallery
Stinger 110 tons
Larnaca port - Lift a stinger from the sea, load it on a multiwheel trailer, lashing/securing, transport it to storage area and unload. Appr. after 6 months we load it again and deliver it back to a Saipem vessel.
See gallery
Heavy Transport of Offshore equipment
Limassol port - Transport of oil and gas equipment from M/V Lewek Constellation to storage yard and unload with the use of cranes, riggers and banksman. The transport included: 50t /30m long gangway, 80t offshore crane with 7m height centre of gravity, 4 floors steel structures.
See gallery
Transport of a PL3 *265tons
Larnaca port - Transport of a PL3 from quay to storage area and unload on stools by 'Roll out' method. After a year we load it with 'Roll in' method and return it back to a supply vessel. A. Soulis Enterprises was the only local company that had a multiwheel trailer with the capability to execute that special heavy transport.
See gallery
Transport of 240t Umbilical reels
Larnaca port -Transport of 4 x Umbilical reels from quay to storage area and vice versa. Saipem trusted A. Soulis to transport the first heavy umbilical reels in a Cyprus's Port. In that project, our trailer had been mobilized in a side by side configuration.
See gallery
VTTI Jetting Piling Pipes
Vasiliko Port – Discharge from vessel, transport and unload on storage area 215 piling pipes for the construction of VTTI jetting.
See gallery
Larnaca Refinery
Dismantle of Larnaca refinery, load and transport all the parts (furnace, burner, distillation columns and storage tanks) to Larnaca port for export.
See gallery
VIEW MORE