RECENT JOBS
- test NEW
- Transport and storage of 250t reels NEW
- Loading transporting and unloading of risers for offshore Oil and Gas NEW
- 200t trestle transport NEW
- Discharging transporting and unloading of 40m steel piles for VTTI project NEW
- Discharging transporting and unloading of 40m steek pipes for VTTi project NEW
- Rental 25t Rough Terrain crane(cherry picker) for the repairs on Lewek Falcon
- Rental 25t Rough Terrain crane(cherry picker) for the repairs on Lewek Falcon NEW
- Supply of 165t counterweights and 250t load cell, for crane load test NEW
- Assembly of PVE Jack-up barge at the port of Vasilikos NEW
- Rental of 250t spreader bar and rigging NEW
- 5 x 11.4m reel transports for EMAS AMC NEW
- Blade repair using manlift NEW
- Enercon Transports
- Koshi Windfarm V100 95mHH
- Oil and Gas Transport of 180t anchorage point. NEW
- Agia Anna windfarm (Rokas) NEW
- Chimney replacement NEW
- Transport of 120t excavator
- Makarios Statue relocation
- Refinery parts unloaded at Famagusta port NEW
- Transport of Internal Combustion Engines for EAC Cyprus, Gross Weight 500ton NEW
- BWSC Dhekelias ICE1 power station
- Transport of 45t boilers from Romania to Cyprus
- Installing of metal press in factory with row boggies (special trailer)
- Transport and erection of the metal roof at Nicosia's university
- Transport of a 984 Liebherr excavator (90t)
- Transport of a 75t O&K Shovel excavator
- Transport and erection of passenger bridge at the New airport Larnaca
- Sundry Liftings
- University of Cyprus
- Silo At Cement Factory
- Different Transports
- Airplane Transportation – Military Aircrafts
- Refinery Dismandling
- Transporting & Positioning Pedestrians Overbridge
- Lifting & Positiong 132 tons Mill at Cement Factory
- Fuel tank transportation
- Transport of fuel tanks for EKO
- Lifting, Transporting & Positioning of 70tons Overbridges beams for a new highway
- Uploading Transformer for EAC
- Transport of an Oxygen Engine using telescopic trailer
- Transport of a 60 ton boiler using row bogies
- Transport of 80 ton Segments
- Beams Transport
- Hauling up of a 180 ton Submarine
- Erection of a 60 ton Boiler
- Erection and Positioning of Steel Structure For Stadium
- Erection and Positioning of Segments
- Dismanlting of Destroyed roof of Ammochostos Stadium
- Chiller Erection
- Boiler errection on EAC Power Station